Building 14 Surgery Remodel
This project entails a full remodel of the entire surgical suite on the third floor of building 14 at the VA Medical Center. MSC will accomplish this project in two phases. The first phase involves removing the former Recovery and Same-Day Surgery spaces, along with the lounge, two adjacent operating rooms, storage rooms, and scrub sink areas, and constructing four operating rooms, one of which will be built to accommodate a future installation of an endovascular imaging system, and office and support spaces such as nurse's stations, pump room, offices, and storage rooms.
For the second phase of this project, MSC will remove the remaining four operating rooms and construct two operating rooms and associated support spaces, to include; anesthesia workroom, anesthesia storage, two equipment storage rooms, gas cylinders storage, lab, blood gas room, lounge/conference room, sterilization room, and soiled utility. Both phases contain an electrical panel room.